Hey there Captain
Spirit running well.
Please read any flagged emails.
11 Lifering Lights have been replaced in aft forward section of vessel as per Jag instructions
Forward Spring replaced at GL3
Harnesses, Unirail, Anchor Points and Tender winch due for Service. Cindy has organised for Bullivants to come down and do all at the same time.
Chemwatch is not working on iPad at the moment. Sean is aware of this and is looking into it. Most of the vessels have the same problem.
Smoke Signalling Light on stern is due for replacement in March. I have sent an email to Willy and Pete early in case they are hard to get. SRF has been submitted
Orange Hand held flare out of date this month February. SRF Submitted.
Top deck Life ring has a crack in it. One has been ordered along with the stickers for it. Willy wants the old lifering taken to office once the new one arrives.
Port side Liferaft with lanyard on stern needs a new G and S put on. Stickers have been ordered for it .
Aft fire Reel tagged out as all rusted out MRF Submitted. Also the retractable clamps for the forward and aft hydrants on the pontoon were badly rusted and a total safety. I got Maintenance to remove them for now so we can still use forward hose. MRF a submitted for clamps
Sean has bought down 4 Bunnings umbrellas which are in the Starboard aft crew cupboard. We have labelled them as Spirit rain and sun umbrellas. They are for crew only use and need to stay on vessel.
BLINK Priority Post - Vessel is to stay doubled up at berth until all Pre start and Safety Checks completed. Reason being no line can ever be left on when departing.
We replaced 15 Seat covers that were torn. Ask crew to tell you if they find anymore as maintenance have more covers at slipway. 😊
One of the 4 covers for the binocular eye pieces disappeared last swing. 🤔
Wheelhouse Master Chair away getting upholstered. Engineer's chair has been swapped out with it for now, till it returns.
No operational radar at the moment as new CTV being installed . Maintenance are going to get Gav down to sort out. I think they are going to use the second plotter screen for Radar and leave CTV Monitor where it is.
New CTV Cameras installed and they have an amazing picture quality. Maintenance still playing around with it.Starboard aft Quarter camera has a time delay at the moment and we have no port wing station cameras or port E/R camera up and running yet.
Have a Great Swing .
Annemaree