Both main engines been serviced 5294 hours next service
Genset running well fixed shutting down problem just need to keep an eye on the kw shuts down when to high
Cd player started smoking and nearly caught on fire . Aces rewired the breaker Is on the spot light braker
Engineers want us to log the gearbox temp when completing running logs
Cleaned and truck washed both air filters on the main engines . Stbd is getting dirty and oily quite quickly and causes the boost to drop a bit keep an eye on it
Make sure if on the side or up the front of vessel use the running lanyard at all times few emails from rob we flagged have a read
We both had trouble with stbd engine goin in to fwd gear a bit of a delay than was clunking in to gear .solenoids where changed from forward to reverse no dramas so far but if thats the problem it might happen when trying to go into reverse so just keep that in mind
New breaker boxes in stbd engine room for anchor whinch and steering pump
Pick up at QC1 at 1045 on Wednesday 13-1-16 its the director. Email from rob
Engines have been degreased
Sealed gap between the roof and canopy to try and stop water when its raining
All bilge system valves have been inoxed
Spare line at qc1 on the stern
After passengers disembark check the adjustable vents passengers have been closing them up and aircons are trying to cool the room and cant
There is a new passage, arrival and departure plans for Trojan and Parangool, your not allowed to utlise Qc1 if the wind speed is greater than 15kts or sea state greater than 0.3m. You have to use GL2 instead. This new procedure is in the sms
First Aid Kit has been serviced
Cctv not recording all cameras and the hdmi cord that plugs into the back is a bit dodge a maint req has been sent for both
The harness needs to be test and tagged and we need to get our second harness back that was sent away for testing
Life raft still out of date
New spot light is at the slip way ready to install
Powerbox at entry of stb engine room is broken, should be getting replaced on wednesday or thursaday, liaise with shaun or Richard. Maintenance req sent.
Genset is getting serviced on wednesday 13th, ring shaun to organise a time.
Scheduled morning and afternoon runs this week parangool is also doin runs at the same time there is a shut down on . We do our normal runs and take the operation personnel only