21/01 Genset failed to start, starter motor and battery replaced (parangools starter)
27 /01 COP 3 Monthly audit conducted by T. Timarni
- no documentation supporting electronic chart updates or schedule of updates
- policy updates for posted policys displayed on wall, possibly no longer needed to be displayed as documents are available on dataweb. Waiting clarification
30/01 mains / Gearbox 250/500 hour service conducted + Genset 250/500 hour servicing - Genset Murphy gauge active wire reattached - Genset oil pressure switch replaced with new - Genset strainers cleaned - recalibrate throttles, still an increase on port rpms when clutched in awaiting response from Hamilton tech to adjust parameters within the system
replaced all switches in 24v light switch panel that weren’t working and spotlight bulb, all functioning properly now ( spotlight dull reported by D/S)
Chemwatch is not working on iPad at the moment. Sean is aware of this and is looking into it. Most of the vessels have the same problem.
BLINK Priority Post - if Vessel is to stay doubled up at berth, all lines remain till Pre start and Safety Checks completed. Reason being no line can ever be left on when departing
MRF 8231 - at times STB side 2nd audible and visual fire alarm does not work when tested.
2nd highflow nozzle found in fire extinguisher box, relocated to our box below #3 bowser
chart correction 998(T)2023 Boyne River light buoy restored. Former notice 998(T)2020 is cancelled. Updated chart correction register