Hi Ron
We have replaced the cables on the cyclone moorings and have the 32 mm line to be connected. Between the weather and finding the time we haven't yet fitted the 32mm line yet which is on the back deck. The cyclone bridles where loaded onto the front deck yesterday.
We had to replace a exhaust manifold on the port aft engine which was more exhausting then replacing the mooring lines.
There is an amendment to the brack time on Saterday which I have corrected on the run sheet.
Air con unit in the stb aft cabin closest to the rear door has burnt out, it has been isolated and MRF submitted. PLC will alarm on start up due to air con being isolated.
stores may be a little light on at the moment due to the festive season but I have submitted a large order on Monday.
Still no MSQ inspection yet
ships intercom is faulty and has been isolated MRF has been submitted.
That's all from me Ron have fun.
Regards Des