Emergency jets not centring when engaged Port side - MRF sent
few flagged emails to read .
Big vessel taking up outside western end on fuel wharf for a few days . Can still fuel on inside or eastern end
Power will be on and off during the day on the pontoon from 26th so not to use shore power during times from 0800-1600 see flagged email
port fire pump rubber hoses have been replaced . Stbd also replaced
scrubbed and hosed inside floors and truck washed outside . Seats vaccumed and than sprayed with deodoriser
I think you might be training Wednesday Thursday as per email from Emma
Amsa was on pretty happy with the boat.
In water survey was due 5/10/22 I've ask gene . Might have to chase up . It's on the vessel survey certificate
ive ordered 2 lengths of rope , one for the bow at gl4 and one for the bow in the marina not the night line .
The normal engine leaks port side the worst . Cindy is making up a big sticker that says fire extinguisher with arrows pointing down please stick on the back wall above the fire extinguisher so it's visible for everyone to see , make sure it's square and level 🤙
cheers have a good swing