1. Cp3 has been dredged, please continue to monitor depth
2. Battery box fan turning on and off intermittently, MRF sent for replacement, work not completed
3. DB confirmed we are only to berth on the western side for medivacs and are NOT to move the ramp
4. Black exhaust hose port side leaking slightly still, noted with maint, looking into clamps options
5. Stbd main heat exchange anode housing snapped off inside body thread, all other anodes swapped out.
6. New vessel phone numbers Duffy 0429451727, Torresian 0428081181, Trojan 0429048978
7. New SMS is onboard and requires sign off on onboard copy and in data web, we have noted a few alterations that need to be made, they have been sent to Tahni through email, if you spot anything else please email to Tahni for inclusion/ alteration.
8. All information on Duffy engineering summary sheet is as per Annie