Welcome back Team,
Vessel is all operational, all checks up to date, mrf submitted for 6monthly inspection of extinguishers.
vessel has been cleaned thoroughly both inside and out
The Minj has left so, back to normal Bruce crew transfers.
Both mains have had 500hr service.
night shift crew has been given the key to the front door of the office, door must be in unlocked by 0350 and locked after 1930 at night once Parangool night shift has started. (Robs specific inspections)
New Mega Fender has been ordered. Popped during master training alongside Bruce.
The Genset coolant circulation pump is leaking, new pump has been ordered and should be on its way. MRF re submitted for coolant in port bilge, pads had been changed and only leaked again this morning.
Bruce crew pick has been moved to 1700 this week. please see flagged emails. have a good swing.