Hi guys, hope you had a great swing off. Below are some notes on what has occurred on BK:
Fire equipment due for inspection January 2022
Epirb due January 2022
500 hour service on mains completed @529hrs
Genset 250 hour service completed @ 7239hrs
Keep an eye on inside of turbo for evidence of possible exhaust leaks both port and stbd MRF in place
Oil leak around dipstick traced back to area behind starter motor.
SMS updates have been done, read and sign off
Horn not operational all swing, few attempts made to rectify but to no avail
13.12.21 Changed seals on both port and starboard main engine sea strainer as port side was leaking at a rapid rate.
Masks are to be worn onboard as of 14/12/2021 (see flagged email)
BK scheduled for maintenance at the marina in the morning 15/12/21 (see flagged email)
MRF in place for both fire hoses as the tags are missing and hose clamps busted
Hope you have a great swing ☺️
Jen