SDS has been updated.
port fwd deck hatch has been leaking in the rain. Removed 20ltrs fresh water and allowed the void to air while on break 5/12. Tighten up the dog hopefully this will stop it from leaking in the future.
Shore power plug vessel end filled up with water during terentional down pour. Let it drain and dry out then used it without any problem but have MRF'ed.
rain water leaking in through the port wheelhouse light fitting and dripping onto fridge. Has been MRF'ed and Tim has worked on it but it is still leaking. Spoke to Brody on Monday 6/12 he said submit another MRF. Done ✅ Tim came down on the weekend and resealed again so he will be waiting for rain ☔️
raw water supply is slow to discharge on port main. Has been MRF'ed and Brody is ordering new pumps for both mains.
Crew transfer vessel CHACO has a new loading/unloading position across the end of the GL4 pontoon. Greg is aware that he may need to move if asked to and has a copy of the ferry scheduled.
Fire inspections scheduled for Tuesday 21st December see email.
Aft spring at GL3 was removed 11/12 due to ware. Put a Temporary line from vessel in place and then nicked a line from the jetty for the vessel. Have ordered new rope etc for new aft spring (plus a bit extra for spares).
MRF 7175 submitted: CCTV picture on SIMRAD very pixelated and difficult to see clearly. Shane Austin (MRF rejected, see email)