Welcome back on swing ! > Boat is running well, there is a lot of growth on the hull so pretty slow through the water...I have put in a MRF to have it slipped & water blasted plus antifouled if time permits.
> Covid cleaning to be maintained after each run as per flagged email.
> The diagnostic warning light randomly comes on at start up on the Stb main. The fault shows Cool.lev.stop ....it is a sensor fault , maintenance know about it, there
is a MRF in.
> Over the last 2 days the port main seems to be leaking more coolant than usual , can't see any new leak, just the old leaks getting worse. I have spoken to
maintenance, there is a MRF already in.
> Schedule change as of Monday 1.2.21, the 1810 run from GL4 -GL3 will now depart @ 1800. This is a permanent change. See flagged email.
> Fire equipment has been serviced , just waiting for the paperwork.
> The Generator emergency stop hatch has been removed and blanked off. This was a directive from the AMSA surveyor.
There has been no change to the SMS as yet , I have discussed the above with Gene and he is putting in a Management of Change to get the ball rolling to have
the SMS updated.....you may need to chase this up !
> Please check flagged emails .
> There were no stores delivered last week ???? Apparently Brian has been away.
We had ordered new rope to replace the fwd spring @ GL4 also 14mm silver to start replacing the tyre fender securing lines. So if you want to do those jobs go for it ! Otherwise maybe leave all the rope in the store room at the office and we can do it next time we are back on Torresian .
> EBA vote Thursday 4th February.
Have a great swing,
cheers🍻,