1. Stbd Genset heat exchange was removed and thoroughly cleaned, it had anode bits blocking flow which caused overheating. Pit has been operating normally since.
2. Port void 2 high water switch is faulty and doesn't reset when it returns to off position. MRF submitted.
3. Cold water sink tap body is leaking and needs repair or replacement MRF submitted
4. Have made up laminated quick reference sheets for us to help stay on top of dates and levels
5. Jeff has asked us to take care when berthing in marina, due to close proximity to other new vessels
6. Several new email addresses for office team, check emails
7. Still waiting on multiple fender covers and fender for cp3
8. We have been running the fuel down lower than normal, doing large refuels to try and flush the excess Biocide from the tanks, it was starting to clog the Separ filters.