10/07 STB main eng 250hr service @ 8753hr
Toilet fans replaced, lights removed from fans
12/07 STB eng + Genset strainer anodes replaced
DVR now plugged into inverter under dash drawing from the house bank and UPS removed from use. Monitor 24v draw when not running Genset or hooked into shore power (bunkering) Reduce 24v system draw as much as possible. House bank MUST stay on and not be switched off, if so power down DVR and when power reinstated correct DVR time.
24/07 electrical inspection conducted by Aces
2040 runs must be departing at scheduled time, no longer permitted to depart early unless authorised by Shift super
Genset service completed 27/07 @ 1360hrs
see flagged emails
be aware that there is still only 1 high flow bowser handle available to service wharf. Jed has been informed and we are apparently awaiting a new one to be sent down.
Awaiting Hazzard label for disinfectant/sanitizer spray bottle from Cindy, also requested new emergency control sticker for the dash.
Have informed office that fire equipment inspection is due.. have not received an answer yet as to when we expect Jason onboard to complete
port toilet was locked due to multiple blockages by passengers. Willie has been informed and advised he was ok with the closure of the toilet and has hinted that we could possibly look at what can be done while vessel is slipped. Emails been sent to Gene and Rob but have not received a response from either one. There is a pen behind the evacuation plan opposite the toilet door which can be used to unlock door if required.