Welcome back guys hope you all had a enjoyable break.
- first aid kit inspection completed 10/06/20
- Crew life jackets gone for testing.
- Port main had water pump replaced which fixed coolant leak.
- Anthony and I completed a MOB with Ruth the dummy, Willie and Graeme onboard to view and record. Very heavy to pull aboard using the Dacon. Didn’t really go that well but can be down. I haven’t heard the outcome from management it’s been left in Rob & Willie’s hands.
- Still utilising Torresian with the whole Covid -19 precautions I place. Haven’t heard anything about it going back to the norm.
- MRF in to have JG slipped to have its bottom cleaned.
- new number in boat phone for Auckland creek bridge.
- Maintenance has fixed oil pressure sensor on port main and boost gauge.
- SHOREPOWER has been switched back to the power stand SM13 in the corner and Torresian has been changed back to power stand SM14 alongside James Grant. This was a directive from from above as they want to eliminate a trip hazard and so maintenance can wheel there trolley through without running the lead over.
- James Grant is running well with no major issues to report. The shipping has been a bit slow of late at GLNG with up to 5days between ships. Hope you all have a good trouble free swing.
Regards Shane.