G’day and welcome back hope you all had a enjoyable break.
- new Scheduled out to help minimise the corona virus with Santos workers. James Grant now doing 0540 and 0620 on demand runs of a morning. Sunrise is also doing a 0545 and 0620. JG TO depart @ 0540 and unload prior Sunrise unloading @ GL4. This is only on the 0540run. JG only to take operators and specialists over. JG also doing the 1740 & 1820 on demand run. Please check new schedule out.
-RADIO CALLS prior to departure a GL3 we are now required to call security to make sure there are no passengers left behind..
- Have been asked to do extra cleaning after each run. We have been opening doors up to air boat out spraying glen 20 or eucalyptus spray and wiping down all arm rests, window sills & door handles with disinfectant.
- Dredging operations, lots more vessel movements between Clinton main & bypass channels with the dredge Woomera and support vessels conducting dredging operations.
- Section 4 of SMS has been changed out. Section 6 part 3. bunkering has been updated Please review and sign.
- Updated SDS folder. There Was a lot out of date.
- first aid kit serviced 11/03/20.
- stb side unique identifier number has been put on.
- new plug has been fitted to end of Shorepower lead. Old plug was cracked.
- new stern light fitted, new wiper blades fitted.
- new heat exchanger fitted to Genset.
- new stb aft camera fitted.
- centered rudders they were out about 10degrees.
- macerator pump of toilets seized on Sunday and was tripping breaker in port engine room. Maintenance got it going again for now but aren’t real confident in it so have ordered a replacement. Have submitted a MRF.
- check flagged emails and mrfs.