Greetings,
There are few things to be aware of / to update you on...
1. All the usual jobs have been done for handover and Ryan knows what else to do. Please let me know of any issues.
2. There is a Registration Error that is coming up on the Hamilton Units that reads "REGST 51" on the panel. This is due to the fitment of a new jet unit control module to the starboard side. Everything works as per normal; the error is just because the unit has not been registered with Hamilton online yet. Brody / Shaun are aware and onto it.
3. Please book fuel for Tuesday morning. 0745-0815 is perfect for bunkers after morning runs. Should have enough fuel to get you through.
4. All MPM up to date and no urgent stores though it will pay to check Tuesday incase items are consumed by crews or shore based maintenance.
5. See flagged emails, no extreme surprises there. A few memos - mostly stuff that has been said before / common sense but obviously there are some issues Management is responding to.
6. Lifejacket demonstrations have been okay. We have been getting random passengers to demo them for us especially on the smaller runs, bit of an eye opener for a few of them.
7. The small card on dash to assist with compass checks has been updated with the new deviations. New Emergency radio calling card fitted also.
8. Had a tidy up with placarding in wheelhouse.
9. Chart updates were checked at start of swing as per current Memo.
10. Fuel should be around half full for you and water nearly full, sullage empty.
11. All machinery and electrics are running fine at time of handover. There is a small raw water leak on the mixer elbow of the genset that I have MRF'd. Emailed to follow up.
12. Have had a few different deckies throughout the swing and been between Torresian, James Grant and Spirit.
13. 0700 run is back to James Grant on weekends with Bruce Crew transfer at 0640 instead of 0645 facilitiating this possibility.
14. New AVR card fitted to Genset after a failure/breakdown. Voltage / EMF figures slightly lower with new calibration.
15. MPM completed over weekend and submitted on DataWeb. All up to date.
16. Keep an eye on port jet unit control oil level, there is a leak evident.
17. Hydrostatic releases for Carly floats are due for replacement 2/2020.
18. Sullage gauge operational again after fitment of new pressure stat unit.
Please call with any questions or concerns.
Regards,
Tony.