Genset is slowing making coolant. Maintenance know about the issue and for us to monitor it. Heat exchanger swapped all ok now.
Audit on the 16/10 went well, only 1 thing was brought up that MRFs to be closed off
CP3 Shorepower connected 22/10. All ok to use all aircons at the same time. CoP will be in charge of test and tagging leads.
Gas sniffer still away, let Willie know if you need one.
New spring line made up
Rubbing strips under CP3 loading ramp has been MRFed
SMS to be signed off
Only the 1 Maintenance day please see log on th 17/10 for details
20 meters of new mooring line in port void to be made up.
1 new log book under dash.
Shaun tightened up plotter seems ok
bilge system valves were left wrongly set up for fire fighting when we swung on.