Glng shutdown finished, back to normal.
Qclng has a shut down on, Spirit doing am and pm shifts.
Boat has been running fine.
Bruce crew transfers at 0645 from Gl3 by Dayshift, it varies for the afternoon pickup.
New generator installed, its 100mm longer making access a little more of a hassle.
shore power is now a 3 phase system and when utilitising shore power a SLB we are using the power closest to Torresian where the 35’s park, Sometimes sunrise uses the lead if spirit is in its berth doing sullage.
Boat was out of water for 2 weeks, surveyed, and antifouled.
Graeme has been conducting master incapacitated drills, Deckhands need to know the channels and where to go,
also deckhands need to be able to berth the vessel in an emergency.....important to start training them.
monthly maintenance checks due 04.09.19.
First aid kit due 05.09.19
All lifejackets underseats have been pulled out and taken out of plastic and straps stretched out and placed back in, to make it easier for passengers to don.
Boat phone is Torresians, I dropped ours in the water, I’ve emailed shift supers, marine supers and jorgo, Jake has ordered another phone and should be here by the end of the week.
Floors and seats were professionally cleaned.
Oxley has been working at ccf3 and has had no wash most days.
See flagged emails.