Hi John,
boat is running ok.
Not much to report this swing. We put in a couple of Mrf’s, just have a look on DataWeb, a lot of things still outstanding.
Test and tag on all anchor points and tender winch has been done.
We found the water leak that was going into the lower stbd aft main cabin, there is a crack on the top deck and Brodie is aware of it, they are going to weld it.
There is a shutdown from the 20th to the 29th of May, the schedule is onboard, they will be running 2 crews on Sunrise, AM and PM shifts, I will be onboard as the opposite Master for most of those days.
See flagged emails about:
- supplies request from Kimmo
- consumption of food and drinks onboard the vessel from Willie, someone from QGC will be at GL3 in the morning to implement that.
The pt aft rpm gauge indicator stop working yesterday morning, Brodie swapped it around with the stbd aft one to see if it was the actual gauge or just a faulty connection, now the lights on those gauges don’t work anymore, you might be able to have a look at it, I haven’t mrf’ed yet.
Have a good swing.
Regards,
Ale.