Maintanence today, 1000 to 1300, use Torresian for any adhoc runs.
Please see flagged emails.
Shore power to be noted in engineers log what time it’s connected and disconnected and where.
Port main raw water pump got changed out on the 11/01.
Shore power point @ GL4 fused the plug and point together. The plug on the end of the lead has been fixed put still awaiting for the shore power point @ GL4 to be fixed. Now operational.
Chrome rubbing strip on port aft has been replaced.
New camera fitted to port aft.
Fire hose has been fixed on pontoon.
Port main engine batteries got changed out on the 21/01/19.
Updated paper charts.
Ladies sanitary bin in female toilet requested by management.
Someone ordered a stool, it’s in the port side void if you need to use it.
Replaced engine room hatch seals.
Updated contacts list.
Certificate of survey arrived, waiting on Certificate of Operation.
Ramp at GL4 has been assessed by Willie and Graeme, stand by......
Have a good swing.