* G.P.S nav card updated 20th June 2018
* Crew PFDs due for inspection in August
*Annual Electrical Systems where last checked on the 21/06/18 according to ships paperwork. Have emailed Willie and Ross on the 20/06/18. May need to followed up.
* oil cooler on the Port main engine is leaking oil from the aft fittings, please keep an eye on the gear box oil. MRF inplace
* Striker pad on the Stdb bow gate latch is loose, please take care when using this gate that the striker pad is not lost. MRF inplace.
* injectors on both mains need replacing, MRF inplace.
* weather proof seal on the Stbd midships doors has started coming loose above the latches, no MRF as yet.
* Genset serviced Sunday 1/7/18.@16795 hrs
Hound doged both the Portand Stdb windows to remove calcium stains from the hard water. We also rain x the Stbd window to prtect them from future satining, please limit the amount of soap used on the Stbd windows to make the most of the rain x protection.
Washed vessel every week. Last washed down outside on tye 1st and 2nd of July.
Last scrub interior decks 3/7/18
Put down aft clears and removed stains as best as possible