QC shutdown has started check time table for overlapping arivel and departure times at QC4 with Mandurama. Mandurama also using eastern side of QC4 pontoon.
All Aircons have been serviced and cleaned
Test and tag completed 28/04.
Main engines and genset serviced 12/04
FM 200 checked and all ok.
All crew maintenance checks up to date.
Chart corrections completed.
Front bow rail welded up and center brace added.
New lids on sullage and fresh water tanks gauges have been adjusted but still out.
Unirail inspected on the 22/04.
There was a fault on the wharf with the shore power check emails no one to use shore power untill notified by willie rob jake or Rosco.
Your first run is at 0500 from GL2
Call security on UHF channel 76 at Gl2 before departing check email from Willie