Vessel running well 2150max
lots of outstanding MRF x 7
sms chapter 6 needs updating is with management
refueling - 2400 per side only fill to third mark from top stop and top up very slow. Marks on gauges are 120ltrs but need to add 250 for proper tank levels. Tanks levels are very approximate.
Fresh water fill slow will overflow into tunnel when full. 3000 per side.
sullage pumping need to start pump on dock first then once taps are set in voids start sullage pumps onboard and monitor closely. 3000 per side.
Electronic charts updated new charts in cupboard
5 out of 7 doors can lock with normal boat key- port wheelhouse and Stb aft different.
fuel 2400Los x tank% +250lts = approximate tank holdings