3/8 genset 250 hr service...plus replace anode and replace fuel filter as per 500 hr service
Shorepower available at gl4.....reset switch is located at the top of the walkway in orange distribution board.....right hand side, bottom 15A switch.
Mrf sent re compass light.... and mrf for uhf radio hand piece
Mrf re safety line top of stairs......mrf re 10m shorepower lead.
9/8 stbd throttle control loose....splines worn...retightened, grub screw, Brodie inspected and swapped stbd to port etc....much improved. New splines ordered.
15/8 250hr services to mains and genset. Genset only done 200hr since shore power is now available at gl4
Uhf radio replaced
New fuel spill kit bag supplied, a smaller boom has been ordered to suit. Lge boom doesnt fit. Small snake supplied.
Macerator float sticks on...has been mrf'd , boys said to thump the side of the pump box....reach inside void and hit on the rear face of pump unit. This has occurred twice, monitor and mrf again if necessary.
Stbd tiller void still leaking from the deck 120 ltrs....
Weeklies and 2 weeklies completed....all okay
Commencing runs from gl3.....RG Tanna, see emails and clipboard documents for info.
Stbd fuel gauge stuck....recalibration booked.
Have a good swing