Hi Ally,
Not a great deal been happening. Vessel has been running well. Still running to GLNG for shutdown. GL3 is now operational but we still go to GL2 and GL4 for pickups and will be till end off shutdown.
Portable water hose to be used from now on when filling up water tanks. It is kept up the top off ramp.
Please read flagged emails.
Have a good swing,
Annemaree