Hi Jodie and Nath
Hope yous had a good swing off.
-GL3 PONTOONS ARE IN FULL SWING AS OF MONDAY 10TH, WE GO PORT SIDE TO ON THE OUTER PONTOON ON THE INSIDE, ALL LINES ARE IN PLACE ( FIXED FWD SPRING, BOW AND STERN)
-You have a maintenance day on Wednesday 12th 12pm to 1430.
-Parangool is still to be required at Qc3 when a ship is in, just dont have to be drifting out the front anymore.
-Genset still shutting down 5/6 times a day, low oil pressure alarm.
- Slow coolant leak on pt side main engine, MRF sent in.
- Both air-cons on stb side arnt working very well, maintenance request has been sent in.
-Gear box oil leak on stb main coming out of outboard hose.
-New rope on carly floats, to link them all together.
- All oils and coolants have been topped up and bilge pads all changed out.
-There has been a few emails fagged for you's to read.
- Next genset service is on 10440hrs
- Tvs have been fixed, the midship tvs are on 240v
- Battery and alternator has been replaced on the Genset
- Port jet ram leaking
Hope yous have a good swing
James
-