Hey Nath and Jodie
We have had a few dramas this swing engineering wise.
There is still problems with the genset shutting down, reading low oil pressure. The boys are trying there best to find and sort the fault with the time they have with the vessel been available for them, Management are aware of the problem.
There is a coolant leak on the port main adding about 5L of water a day. MRF sent in.
Covered up most the marks on the stb side from Bruce.
Replaced all the mornings lines at the Marina berth.
The CCTV has been doing a DB error code every now and then , from having hard shut downs from the genset.
Nothing has changed with the security around the ship
Willie said RG Tanna will be starting up at the end of June, we have a heap of rope on the back deck for the new morning lines when they decide what side Parangool is going on. Ordered a hot knife for the Gool.
Sullage gauge hasnt worked all swing until 27-5, so we have just been going off the fresh water gauge, if it goes faulty again.
Genset next service - 9850hrs.
Jet inspection hatch seal on tne pt jet is leaking water. Mrf sent.
Few emails that are flagged, one especially about the new proceedure for entering and exiting RG Tanna. 29-5-17.
Thats about it, enjoy your swing!