12-05-17. Center toilet and fan repaired. Gearbox breaker sw tripped again, MRF in for it.
The barge at CP 3 has left. There are still 7 piles in the water all with lights on.
16-05-17 chart corrections up to date including T and Ps on the bottom of each chart in pencil to edition 10, please leave these on the bottom of each chart as they will direct you to the I pad folder where the T and Ps for each chart are kept.
New radio battery under dash fitted. Ships LED torch stopped working, sharkey took it away for repairs.
Emails regarding fuel recipes and engine hours.
22-05-17. Email on the new times without the 35m
23-05 -17 Emails regarding extra runs.
24-05-17 Genset oil change @ 22122 hours
25-05-15. Email re additional run.
New loading ramp at CP1 is no good for a Medie Vac. Either use the side it is not or swap then back to the original one for any stretcher use.
Curlew is still doing anode work to the pontoon at CP1 and divers expected back this Thursday (1st June) at CP1 on Diva 8, be sure to radio them before going in.
rpm feedback and jet moved alarm still goes off every now and then, rare, but has still happened a couple of times since Sean fixed the gearbox sensor. Maintainence know about this and will have another look at it when they get the chance.
29-05-17. MRF in for STB main engine belt guard
The afternoon runs off the island: BK has been doing the 1430 (not enough pax to warrant both BK and Torresian doing a run) For the 1545 and the 1645, as soon as BK has 90 pax then BK leaves and Torresian takes the rest of the pax and leaves on time.
29-05-17 and 30-05-17 emails regarding RG tanner
30-05-17 emails re loading at CP1 and 3.
Hopefully that's the lot. Have a good swing see you next swing.