15/2. Genset heat exchanger replaced.....previous unit split, spraying water copiously.
20/2. UHF aerials x 2 ordered. Supplied 3/3.
23/2. Genset and mains 250hr services completed....overdue.
Port exhaust overboard discharge pipe removed and repaired leaky hole.
Replaced Stbd alternator and fire pump , as per maintenance schedule. Mpm.
Anodes checked. Batteries checked. CCTV checked. Gas test and detector checked.
27/2. Weeklies, 2 wklys, monthly and 3 monthly completed.
MRF re hole in port fire/bilge line. Strong possibility that all these lines in similar condition.
Have had issues with wifi.....dongle been replaced and finally all okay.
1/3. Got bashed at gl4 on outside berth, broke spring and vessel damage to Stbd sponson.
Advised by W. Ewins to call no wash....re passenger transfer, or vacate outside berth. Incident report lodged.
General.....check emails, re Ovid inspections, etc.
6/3. Weekly's completed....genset strainer collects a lot of growth quickly.
Port fire/bilge return line, cut and fitted new section plus replaced flexible hose section.
Genset 250 hr service
Any issues give me a call.....have a good swing