Hi Nath and Jodie
Hope yous had a good swing off.
We got a fair bit done this swing:
▪Claire and Nath you have medicals on the 13th of March, refer to email.
▪No changes in regards to security around the ship, you do have a few scheduled runs from Monday to Friday, and just the 2 in the morning and arfternoon on the weekend. BRUCE transfers still change each week depending on tides.
▪ Stb engine still getting upto 84 degrees at full revs.
▪A maintenance req has been sent in to get the hull clean, its dropping speed every week.
▪The Wifi on board is still faulty waiting to get repaired.
▪The plugs have been repaired on the stb fwd TV.
▪500hr port and stb gear box services have been done
▪500hr main engine services port and stb ( replaced air filters ) next service 6500hrs
▪Resealed port and stb gearbox coolers, hoses were leaking around the fittings.
▪250hr Genset service has been done, replaced fan belt and reinsulated underneath the hatch cover. Next service 8292hrs
▪500hr genset service has been done.
▪ Fixed stb bow hatch seal
▪Replaced the stb and port side coolant pumps, degreased stb bilge.
▪Load test Aux battery, all ok.
▪New hinges have been fitted to stb side fuel box lid.
▪Aft deck life ring light was out of date, has been replaced and also fitted a new holder for it.
▪ All oils and coolants have been topped up.
▪both engine gauges have been replaced wity new ones
▪Jeff was organising emergency exit sighns please get onto him before he goes