15th Parangool in to slipway for maintenance 12.30
Changes to run sheet
Run engins at 1900 to avoid temp going over 81 degrees. Have put in MRF for this
When on standby by ship run only one engine to keep hours down. Try to keep engine hours close for service reasons
6 monthly due on 15th
Note all fire extinguishers have been stamped and tested. He still has to finish FM 200 AND CHECK ALARM SYSTEM. Hopefully this will be done on Wednesday with maitannce. Check with dave
Note emails on crane removal at CP3 no wash aplies
Boat was sprayed for cockroaches
Turbo on stbd side was replaced you will still have to vacume air filter if boost drops
James. See email on master training for Gavin Ray on 26th feb
Port side filling station has had new hinges put on it. Hopefully starboard side will be done on maitannce day
Insulation for genset box is under middle seats in a plastic bag see MRF
There is but loads of MRFs , the wifi power cord is loose, turns off all the time