05/01/2017.
Flagged important emails.
Lots of phone call with extra trips.
New procedures section 6 SMS. CP3 passenger pontoon access gangway barrier, and anchor procedures.
10/01/17 regarding SDS for BK anti fouling. Is in MDSS folder New rubbing strips fitted to CP1 ramp
11/01/17. Whole new section 4/5/6 in SMS to sign off. New genset lift pump and shut off solenoid fitted.
16/01/17 1st medic vac, no problem Vessel fumigated for cockroaches Seat removed from stb side for repairs 18-01-17 seat repaired and fitted.
17/01/17 Genset full service, run new hose up to windows washers, new pump on order. Email re shore power at CP3
18/01/17. Departing on demand from now on must have superintendent name added to the trip log. See email.
Email regarding phone calls to Central control room, no more calls to CCR we are to inform security at FLNE of extra runs and crew change.