05/01/2017.
Flagged important emails.
Lots of phone call with extra trips. It's worth checking with security at CP1 as they have some we did not have and we had runs they didn't know about.
New procedures section 6 SMS. CP3 passenger pontoon access gangway barrier, and anchor procedures.
10/01/17 regarding SDS for BK anti fouling. Is in MDSS folder New rubbing strips fitted to CP1 ramp
11/01/17. Whole new section 4/5/6 in SMS to sign off. This swing needs 001-014 ammendment signed off. New genset lift pump and shut off solenoid fitted.
16/01/17 1st medic vac, no problem Vessel fumigated for cockroaches Seat removed from stb side for repairs 18-01-17 seat repaired and fitted.
17/01/17 Genset full service, run new hose up to windows washers, new pump on order. Email re shore power at CP3
18/01/17. Departing on demand from now on must have superintendent name added to the trip log. See email.
Email regarding phone calls to Central control room, no more calls to CCR we are to inform security at FLNE of extra runs and crew change.
Incoming night shift have extra runs on the morning of the 29th 0245 and 0415 also on the 1/2/17 at 0415.. See emails. The times have been varying a bit on the night/morning, depending on the ships departure or arrival.
There is a new 0500 run from CP1 in the schedule
24/01/17 We had CP audit on board. There are 2 new books in wheelhouse 1st is the ABUE induction all crew must read and sign and any new crew that have not been to APLNG site. 2nd book is APLNG support vessel hand book for your reading.
Both hand driers out of action, the 240v breaker sw is off. There are 2 MRF regarding it.