Hi AnneMaree,
> test and tag has been done.
>Periodic survey has been done, all good.
> Loadline certificate is due on 3rd of November , I have emailed Dave .
> Humphree servo #3 is not working, it will not calibrate. MRF has been put in.
> have updated most of the SDS's , still waiting on a few. Krystle is onto it.
>New fire equipment and smothering system paper work is in SMS.
> Have ordered some reflective tape to replace old on 2 x smoke/light life-rings.
> One of the PFD's was due for service , there is a new orange one in the wheelhouse locker to replace it.
> Port aft main eng helm tachometer occasionally goes off the dial ,resets itself when engine is turned off.
> Any run that takes longer than 20 mins need an explanation in the log.
Have a great swing, Ross.