Handover Notes Trojan from Sunday 23rd October.
All going well. Sometimes starboard engine temperature goes up to 90 degrees C then goes down quickly to normal at 84C when first increasing in RPM. Anchor does not free fall when clutch is out. Have to lower anchor manually. More plastic clips for blinds need to be ordered.
At this point (23/10) OTS Security Auditors from Canberra has still not done a random audit as expect.
14/10 Fri. Email from Dave re: Gas Ship Crew Shore Leave. Ensure that shore leave numbers correspond with shore leave form (received by the agent). If the numbers over and back are not the same, contact Dave Bennet.
22/10 Fri. Shaun did the 200 hour service on the genset. He changed the impeller, oil filter & anode. Next service due at 13791 hrs. Shaun also checked the port & stbd engine mounts. Shane onboard to do the test & tag of the electrical appliances. Kev's sandwich maker tested as well. Samsung Tablet charger failed. It wasn't charging properly anyway and new charger had been ordered. Sharky on board to deliver new double USB charger for Samsung and one new black cable. Old white cable is spare. Sharky also said we will have some rubber rubber strake once Christopher B is fitted with all new stuff. Trojan will get the 2nd hand rubbing strake that will come off Christopher B.
23/10 Sat. Loadmaster advised us that new safety chain will be fitted at QC3 pontoon like QC4.