New engine room fans, port and stbd. Both working and dramatically reducing engine room temp.
Fire fighting equiment has been tested and tagged, waiting for paperwork.
New turbo fitted stbd main.
First aid box checked.
Check flagged emails. Espcially regarding performing the saftey msg on each run on P/A system and assisting qc sequrity with problem pax.
3 new (replacement) pages in sms. Section 4 responsibilities (definitions of DPA ). Section 6 onboard operations (7,8,9). Section 4, responsabilities (organizational chart and lines of communication.)
New anchor has been fitted, the shackle pin needs to be replaced because it gets caught on the bow sprit, maintenance team are aware of it and will fix it asap. There is a new proceedure on the way, in the mean time the anchor is good to go, you do not need to connect it to the chain now and the handle for the winch is behind the helm seat so if you need to drop it just plug handle into top of winch and turn anti clockwise to release the brake, oviously lock it off by going the other way to retrieve.
Brodie is going to bring down a new cover for stbd aft air curtain, he has the broken one.
Vessel is clean and all fluids are topped up.
No stores ordered this week, fairly well stocked at the moment.