We have had no real dramas this swing, engine rooms were washed degreased and vacced out 25/7/16
vessel scuff cleaned, although the mark on port side towards bow has proved. Too difficult to scrub off with our available equipment . Truck washed 25/7/16.
full interior clean including mould removal from skylights 26/7/16
there are some outstanding MRFs , completed MRFs have been closed.
engine deck and entry hatches have been leaking water when hosed under pressure or heavy rain, maintenance is aware and options for better sealing are being discussed .
anodes were removed for inspection 25/7/16, all anodes in plant display about 20% wear, 80% viable material so they were put back without being replaced.
extra hose clamps added to Stbd exhaust overflow hose to meet standards! top one is not really functional, given its position over tightening it was going to cause damage to the hose, so where it is right now is sufficient .
After jet units are engaged , vessel has aft momentum and not forward movement as was the case previously
Please se review emails re;
CCWG minutes being read at tool box
fauna training
wicet no wash ( in place 24hrs fir 2 weeks approx)