Torresian Master Hand-Over 2nd August.
13/7 Port battery charger faulty causing decreased volume of speakers in main cabin AND Fire Alarm Panel Fault. Stbd toilet finally stopped flushing. Locked door to toilet. Apparently maintenance department have new toilet switches on order.
14/7 Email received from Dave re: run schedule changed for GLNG vessels starting from Monday the 18th.
15/7 Shaun & Brodie changed both house batteries out for 2 new ones. Shaun said battery charger is not rated to charge both house batteries. Shaun will consult with Jesse about possibly changing the battery charger as well. Email received from Rob saying that Cap Sunrise will be de-mobilised from the 15th of August. Seal needs to be replaced on cam lock connection of sullage hose. Cam lock is lose once connected to outlet on the boat.
Six (6) new AA Btteries from store order placed in a snap lock bag and stored in port side wheel house in side pocket.
17/7. Coolant in GenSet draining away. Richard replaced hose on oil cooler. Problem fixed. Tried to plug in shore power. Kept on tripping when switching over to GenSet on boat. Tried a different shore power cable & same thing happened. Water may have got inside to outside shore power breaker on previous day. Took water over bow on Saturday, winds a constant 30 to 35 knots gusting over 40 knots. Heavy rain. Charts in under wheel house got water damage. Need a designated cylinder for storage.
18/7 White Internet Box has tripped out twice in 2 days. MRF # 2648 Fwd air conditioner in main cabin not coming down to temperature. Problem has been the same for over a year. MRF # 2650 Shore Power in vessel keeps tripping out when shore power is selected.
19/7 MRF # 2655 Wi-Fi issues onboard. Jake & Dave onboard to check out the problem. Air Conditioning contractor (Mick) to look at the forward main cabin air conditioning unit. He said it needs to be replaced. Sealink to decide their options. Replaced rubber Seal on fore deck hatch port side. Supply requisition ID # 1792 Walled mounted hand towel dispenser (3rd request in 2 months). Supply requisition IS # 1793 Tube/cylinder to store paper navigational charts in.
Boat Phone charge connection at the base of the phone seems a bit loose. Phone taking a longer time to charge.
Email from Dave today re: Ship's Log entries in paper version.
21 July 16. Email from Dave regarding fauna reporting cert please read
24 July oil and filter change on genset and re installed genset alternator cover - Richard maintenance day
july 23 start two full weeks of no wash at WICET. For barge 1201 two weeks from July 23 no wash current
july 26 email fron from Dave to see notice to Mariners 333(T) of 2016 regarding Jack p Barge 'Ocean'driller and Shackleton working in vicinity of Clinton main and bypass NO WASH. See notice