Welcome back on swing.
Boat is running well.
> Nancy Wake is doing Torresian runs, so James Grant is backing into Torresian's berth when the 2 boats are both at the MOT.
> See flagged email from Lee Jorgensen re pile guide replacement at the MOT on Thursday 2nd July.
> Sullage pump has been out of action for the last few weeks and still is. Sullage is to be pumped out at the service wharf. Hose is located next to diesel pump 4, instructions are above the hose.
The hose will not reach if bow in on the inside western end, so only option is outside western. The pump sometimes trips, so if it's not working call the marina office and they will reset.
> The mooring line set up in Torresian's berth is the same except you back in. Bow on ( backup on it), fixed stern line, running line for spring.
> Port main coolant has filled the expansion tank, ..........process of elimination in progress:
*Heat exchanger cap has been replaced ( with a second hand one, waiting on new).
* Sample of coolant has been sent away to check for salt.
* Monitor coolant level in expansion tank ( currently just over the full mark at AM Prestarts )
> Fire extinguishers and smothering system has had it's 6 monthly inspection. Waiting for certificate update on SharePoint.
> First Aid kit has been inspected, next due in December.
> Engine room fire damper release arms have been freed up and greased.
> Fresh water tank has a small continual leak . Top up to 300 ltrs . Vacuum out void once a week. Monitor.
> If you didn't see the Deputy news feed the phone number for the bridge has changed. New number 07 49700700.
Have a great swing,
Ross , Liam, Kev & Pete.