We had the compass adjuster on board he said the compass is stuffed. A new one is on its way and will need swinging.
Still not allowed to use GL2. New weather site to use is Metweather, not BOM as previously advised. Metweather updates are supplied via email from Dave.
Stb main gets hot sometimes if run flat tak for a while, try and keep temp below 85. Maintenance is aware but the keel cooler needs cleaning. (Divers or out of water).
Cap Spirit is no longer running. Trojan will back up on the 0530. The following is a system approved by Dave:
This vessels max load is 147. If you are getting close to 130 call Trojan in (they will be standing off till needed.) That way pax can choose us or them.
New anchor on the way with new proceedure for deployment coming.
Hand over vessel to Trojan crew at QC1 1700.