Welcome back!
Stb side add blu injector lines have been adjusted as it was noticed by crew they were in close contact with the exhaust, hi temp ex blanket also adjusted.
Port side fire extinguisher brackets readjusted as were loose and clips hard to access.
14/02 Gearbox oil cooler lines port and stb replaced after noticeable wear was discovered.
15/02 Port main faulty Wet temp sensor replaced.
21/02 500hr mains and gearbox service completed.
Stb side jet unit high bearing alarm has gone off a few times, maintenance is aware. (Seems to be a loose connection fault). Please refer to handover notes from last swing also as nightshift crew have been having issues with Shore power tripping out (has been MRF'd)
Grip tape on roof walkway is coming away, it is scheduled for replacement
Chart corrections have been updated on dataweb and log
Enjoy 👍