Port eng removed sump leaks 15/05 std will be done 29/05 along with coolant leak and heat exchanger
22/05 new anchor installed more chain is needed they sent some chain to the boat but it has to be the same chain that is on the boat now.
Thursday 26/05 surfer will do the 0830 run instead of BK
23/05 emailed jake about first-aid due 27/05 24/05 has been done due 12/08
std eng serviced 23/05
23/05 procedure for anchor operation onboard
Starboard engine thermostat a bit sticky Richard know about will change when pulls engine our to fix leaks
have ordered life jacket lights waiting on delivery
Starboard engine no longer getting pulled out this weekend (Duffy will be getting repaired instead)
new anchor retrieval procedure (temporary and will be amended by Jeff Davey to include procedure to operate with out anchor) please add to SMS after you have read
paper hand towels on back order
had starboard engine control play up at start of swing (has not reoccurred for two weeks since). please read MRF to see what happens and how to fix if it happens to you
fuel -I stop filling at 3/4 mark as gauges inaccurate
sewage gauge dodgy still I have been using fresh water level as indicator of approx Poo level
richard has to come back some time to replace screws that are too long on port side clears and have gone through the roof
starboad main engine turbo bolt replaced Tuesday night by Brodie as 2nd one snapped off and boost pressure loss