Safety dvd is now operational, however the safety video and announcement are in different folders. Safety dvd is in videos>goodna>safety. Announcement is in music. To have them in the same file the announcement will need to be converted to a blank video file. The safety message will also continuously play if not paused at the end of the video.
the flasher has been fixed and is a now a correct marine flasher.
the port main has a coolant leak in the heat exchanger
the stbd main still has the same coolant leak
generator to be run 30mins once a week
stbd door handle MRFed
Adblue lines changed by maintenance
19/10 atrium aircon cleaned
I have ordered new water filters for the wheelhouse sink, when they arrive please let Brodie know and he will change them (the magnet with date change is stuck on the side of the air curtain pt side)
I have ordered a rubber black mat to replace the broken one on the stbd side, new binoculars please return the old ones, and a new battery for the hand held radio (at helm) please take old battery to the office as it is there's on loan. please see flagged email regarding caustic ship loading on the 25th please see flagged email regarding chart corrections to be added in handover notes
the following notices are in place and chart corrections completed
MSQ/TMR Issued by Gladstone Maritime Region on 22 January 2025 Area: Gladstone pilotage area Locality: Port of Gladstone Activity: Extreme Weather Event Contingency Plan 2024 - 2025 Mariners are advised that: The Maritime Safety Queensland Extreme Weather Event Contingency Plan 2024 – 2025 is now live on the web. The overall objective of the plan is to provide for the safety of vessels and their operation during extreme weather events. The Extreme Weather Event Plan utilises emergency management concepts such as, a comprehensive all agencies approach and principles to best manage emergent events. The plan can be located here: https://www.msq.qld.gov.au/safety/preparing-for-severe-weather Gladstone region plans for Rosslyn Bay, Fitzroy River, Port Alma, Gladstone, Bundaberg, and Hervey Bay regions can all be accessed from the above link. Mariners are encouraged to read the relevant plan in preparation for the extreme weather season.
NOTAM Edition 21 [895-929]_Issued 17/10/2025: Calliope River - Wreck Maritime Safety Queensland Notice 451(T)/2025 A stranded wreck marked by a special light buoy, Fl.Y.2·5s, exists in position 23° 50'.40 S 151° 12'.90 E. Mariners are advised to navigate with caution in the area. Chart temporarily affected - Aus 245
NOTAM 908(T) Edition 21 [895-929]_Issued 17/10/2025: Harbour works; restricted area Former Notice - 746(T)/2025 is cancelled Maritime Safety Queensland Notice 362(T)/2025, Notice 470(T)/2025 Works associated with the construction of a reclamation bund wall are in progress. A restricted area exists bounded by the following positions: 23° 47'.00 S 151° 08'.98 E 23° 46'.82 S 151° 09'.32 E 23° 46'.05 S 151° 09'.45 E 23° 45'.88 S 151° 09'.74 E 23° 45'.40 S 151° 09'.07 E 23° 46'.10 S 151° 08'.56 E. Light buoys, Fl.Y.2·5s, exist in the following positions: 23° 45'.87 S 151° 09'.70 E 23° 45'.82 S 151° 09'.63 E 23° 45'.77 S 151° 09'.56 E 23° 45'.69 S 151° 09'.44 E 23° 45'.60 S 151° 09'.33 E 23° 45'.52 S 151° 09'.21 E. Mariners are advised to navigate with caution in the area. Chart temporarily affected - Aus 245 - Aus 819
Chart correction completed- NOTAM Edition 20 [848-894]_Issued 03/10/2025: Gladstone - South Channel - Racon; structure colours. [TRACING AUS 246 - 390/2025] Insert structure colour, G 23° 53'.916 S 151° 30'.388 E structure colour, R 23° 54'.059 S 151° 30'.544 E [TRACING AUS 819 - 533/2025] Insert structure colour, G 23° 53'.92 S 151° 30'.39 E Delete magenta circle with legend, Racon (G) 23° 53'.9 S 151° 30'.4 E