Welcome back.
Vessel operating well,
500hr genset service on 20/08
New dipstick for main engine oil installed on both mains
Tams are working at the pontoon at GL3 replacing the flooring. Lots of equipment on the pontoon, everything is kept clear of our operation and they have both ours and James Grants schedules to stop sandblasting work during our arrival and departure times.
A new fuel card has been requested as the current one is snapped in half, but it does still work.
Aft air con has been serviced and fixed. Is now working again as.
Cobra coat can no longer be ordered, furniture polish is to be its replacement.
Fire hose between us and James grant has been shortened. It cannot reach the full length of the vessel, only to roughly half way down. Crew have been using the hose at the bow of spirit to hose down the boat.
See MRFs as per register
Have a good swing,