Welcome back, hope you had a great swing off.
25.8.25 genset and mains serviced
maintiance attempted to fix windscreen wiper however it is still getting stuck on
27.8.25 new life jackets delivered to replace ripped ones that were reported earlier in the year
28.8.25 all professionally deep cleaned (stbd aft still not working)
30.8.25 anchors winch solenoid changed- winch operational
31.8.25 stbd void 3 hatch seal replaced
inulation pins on Eng room hatch replaced
7.9.25 main engines 250 & 500hr service completed
Following chart corrections completed
NOTAM Edition 17 [725-768]_Issued 22/08/2025: Gladstone - Harbour works Maritime Safety Queensland Notice 362(T)/2025. Works associated with the construction of a reclamation bund wall are in progress in an area bounded by the following positions: 23° 47'.00 S 151° 08'.55 E 23° 47'.00 S 151° 09'.83 E 23° 45'.68 S 151° 09'.83 E 23° 45'.68 S 151° 09'.55 E. The extremities of the construction area will be marked by a special light buoy, Fl.Y.2·5s. Mariners are advised to navigate with caution in the area. Chart temporarily affected - Aus 245 - Aus 819
NTM,S edition 17, nil notices to affect chart 246
Have a good swing 😁