Joined vessel 26/3/25
26/3/25 see flagged email about foot pump for pumping up stores trolley tyres from P Abraham
27/3/25 MRF submitted for hull clean
27/3/25 maintenance replaced non return valve in genset raw water line between primary and secondary strainer in port fwd void , barnacle busted pipe work as per log , not sure it worked perfect as there is barnacles in the pipework when you put your fingers in the pipe at primary strainer heading off to secondary strainer and barnacles still evident when cleaning secondary strainer ? 30/3/25 removed rainwater from forepeak voids and fuel bund trays
31/3/25 wheelhouse light switch on dash replaced
1/4/25 white extension lead tagged out and sent ashore as was faulty, just have the yellow one on board now
2/4/25 250 hr main engine service completed , which is just anodes changed out I believe
5/4/25 removed rainwater from genset housing, cleaned out
6/4/25 rainwater removed from both forepeak voids and fuel bund trays
9/4/25 MRF submitted for MOB relaining clips to be replaced on roof
9/4/25 see flagged email from W Ewins, extract from email as follows
" Please see the email received from Shane Whitlock regarding future communications for unexpected events in future.
Please contact Sealink operations in the first instance and do not contact APLNG security as they will be notified by ConocoPhillips when and if required. "
11/4/25 Vessel due to go on slip on night tide , Stbd gearbox to be replaced , engine alignment and hull clean (no anti fouling application however I believe) Dayshift crew have the vessel left with sea cocks open after day operations and just require to switch on batteries down aft, to get underway for crew to slip vessel , the genset batteries are still on, please leave fridge ajar to prevent mould growing inside whilst there is no shore power to vessel many thanks , UHF radio channel usually on ch:65 , I believe slipway uhf channel is 73 for slipping activities, I have attached another sticker to the dash for bridge control phone number 👍 Vessel due to be back in marina on Sunday ready for operations on Monday
Cheers Nathan