Hello
joined the vessel Wednesday 26/3
> Sam Lowe has been fill in master from 26/3 to 4/4
> vessel slipped Friday 28/3 for the jet unit seal repair. Leak has been fixed and ingress of water to port E/R has stopped, was given a bum blast while on the slip
> 31/3 heavy rain today and have found a water leak in the wheelhouse, strb side wheelhouse light fixture and also old cctv camera holes, MRF sent to maintenance
> 1/4 maintenance have brought down a new gas tester for Torresian, loan gas tester has been taken back to maintenance yard
> 3/4 maintenance onboard today to rectify a voltage fault, findings were a faulty fuse port side ( has been fine since). Have had maintenance on again for pm runs due to control failure. Stb bucket remained in up position while coming into berth at GL3 emergency steering utilised for berthing and James Grant took over runs. Vessel brought back to marina where maintenance had discovered that the potentiometer on the Stb jet unit had failed resulting in a control failure. New potentiometer has been installed and system recalibrated. Sea trials were performed to confirm fault, ( fault fixed and back to normal operation)