26/3 500hr Service on mains
27/3 250hr service Genset
30/3 Leaking fitting on Port Oil cooler was replaced.
Removed excess Spill kit from vessel to stores.
1/4 Safety DVD (USB) was replaced with an actual DVD. Now much easier to operate. Just press play. 😁
4/4 Bailey on board to preform PM's. (Void inspections)
6/4 Astern Propulsion failed while berthing at GL3. Brody attended and recalibrated jets. Incident report notified management. 9/4 Stuck bucket J1. Incident report notified maintenance and management. Maintenance replaced solenoid.
10/4 port jet bucket got stuck again. Maintenance replaced ram on 11/4.
12/4 Fire inspection was completed just waiting on certificate. Electrical inspection is due April.
12/4 Aegis preformed a calibration of the fixed gas detector system onboard and the portable sniffer.
15/4 we got a new cam lock connector on the Sullage pipe but we haven't used it yet.
Shore power on/of switch is getting warm. MRF'ed it. Matt told Blair this was normal they all get hot.
Matt had a look at the Coolant leak on the Port main which has slowly gotten worse over the first week of swing. Said this will not be fixed as it is leaking from the head and new engines coming anyway.
Checking coolant in the morning and then again in the afternoon. Topping up every day but it's just spitting it out.
Havent had stuck bucket for a few days now 🤞
Help yourselves to the milk in the fridge
Hope you have a good swing. 😊