Welcome back lads, we hope you're all fresh and pumped for your swing on!!!
🔹 GPH training for Josh Watson 5 days and signed off
🔹Vacuum water from tiller flat after big rains 10 ltrs
🔹Monthly and 2 weekly's completed
🔹 First aid kit serviced.18/03/25
🔹 Mains serviced 500hrs 18/03
🔹 Rear speaker swapped out, but still issue with sound output
🔹 STB side boarding rubber Matt to be replaced by maintenance (damaged)
🔹 STB mains fire/raw water line has a pin hole in alloy tube (opposite oil dipstick) MRF'D (sleeve put over pin hole,( temporary fix).
🔹 Scrubbed and degreased bilges
🔹 Vessel truck washed 25/3/25.
🔹 Polished off a lot of the black marks around the stern and upper deck stairwell (work in progress)
🔹 Defrosted fridge and cleaned out
🔹 Genset serviced 24/03