Hi guys,
Mob procedure now in sms with the direction from Rob to remove the rope ladder from the vessel.
Sms errors have been corrected however there a still a few minor mistakes that need corrected.
Ventilation has been installed under dash with two barrel fans.
Ventilation mods also done in aircon void
Corrosion issue under vinyl wrap lower edge and under paint on duckboards reported.
Covid temp recoding has now finally come to an end, no longer required as of 6-2-25
Viking is tags to be removed from pfd's when the replacements arrive, see email 6-2-25
New pontoon in place at cp1 with one side available and temporary schedule in place
Will.
N/S
For the morning runs we are only parking stbd side to the pontoon at CP1. The lines for port side berthing are on board so they will need to go back on once connico finish the new gangway and painting etc. see emails.
At night we have been running 2 aircons on shore power. Has not tripped once. We are still having issues running more than this on shore power but MIT is looking at it and discussions are under way. Speak to Isiah if you have questions on this or with anything electrical as he has been going through the drawing and conversing with MIT and is up to speed.
Goodna is combing the 0535 and 0540 to just a 0540 run. Check emails.
On the 0630 I've been waiting over at CP3 until 0615. If BK is ready to go by 0615 then I let them go first, Goodna follows to do the 0630 off CP1 (only one ferry at a time can use CP1) if BK is lagging then go at 0615 and BK can wait until we depart.
Alternators are working and seem to kick in at all times putting in 80 amp a side, this has helped with battery life and now that the aircon void temps are better this helps with power too. Things have got a lot better!!!
To activate the fan system under the dash there's a switch for it (gpo) so you don't have to run it at all times, just in the afternoons when it gets hot in there.
have a great swing, Liam.