*Brody serviced Port Mains coolant system on13/4/16
* Genset raw water system was blocked by a solid mass of barnicles from intake through to flexible hose off strum box. It has been pulled apart and barnicle were removed. Luke is talking about getting a diver in to clear from intake to hull.
* Monthly checks completed
* Compass was swung 7/4/16. Error removed and new card is displayed. Error is nil all the way around.
* added all paperwork to S.M.S that was floating around on helm station.
* closed out all completed MRFs
* self Audit completed and all safety equipment tested. Have ordered a small torch for grab bag.
* tag and testing completed
* MRF 2400 genset fire flaps wire cable stretched..not closing. Work partly completed. Please call Brodie to finalise. Wire cable and crimp on helm station.
*MRF 2417 non skid damage on stairs and Port walk around.
* ordered new fire buckets.
* safety stickers on stairs replaced with new stickers.
* spill kit re stocked.
*Please check 30 day rolling shipping schedule for next arriving ship. As below.
* Carley floots were removed cleaned up and new stickers put in place. Waiting for new reflective tape which needs to be put on both sides of Carley floats. Cleaned under Carley floats
* All bilges including Port tank rooms were inspected and cleaned out of encrusting salt. Stbd tank room need to be vaccumed out with Brodie . Confined space.
* Fuelshut offs were tested. 20/4/16
* cleaned enginemount fwd out board onoPort side with steel brush and Lanlon.
* flexible fuel lines were replaced on Port and Stbd.
* repaired both Port and Stbd bow fendering and more tape is in cuoboard near toilet.
* reorganised cupbord near toilet.
* updated induction paperwork to Sealink.
* found tool kit of Rob Bens that was in tiller flap, genset void. It was particularly filled with salt water and it took me 2hrs to remove the surface rust off the tools. Pls leave in fwd Stbd void until Luke Francis o.ks giving back to Rob Ben. Thanks
*Scheduled runs in vessels Calander 5/5/16 13.15 GL4 to GL2 3pax
17/4/16 11.15 GL2 to GL4 3 pax
Rolling 30 day ship schedule.
Inbound POB
ETA at GLNG
Ship Name
Ship Size
Estimated Loading
Recommended
Time
Terminal
Quantity (m3)
ETD
24-Apr-16 12:00
24-Apr-16 16:00
K. Mugungwha
151,812
150,899
26-Apr-16 11:30
01-May-16 05:30
01-May-16 09:30
Trinity Glory
154,200
152,000
02-May-16 17:00
06-May-16 10:00
06-May-16 14:00
Seri Bijaksana
153,023
149,728
07-May-16 21:15
10-May-16 00:45
10-May-16 04:45
Y. K. Sovereign
126,540
125,998
11-May-16 23:30
18-May-16 12:30
18-May-16 16:30
Seri Begawan
19-May-16 22:15